News

Confined Space

Seawork were tasked with the removal of debris, silt and sediment in a storage tank. Exceptionally tight access and a ...

Fast Turnaround on Anodes

Seawork received a call late in the day to attend a Car Carrier Vessel. The requirement was to remove 18 anodes from ...

Outfall Maintenance

Seawork were engaged to undertake the replacement of the new tide flex duck bill valves on an outfall in 25 metres of ...

Culvert Tideflex Valve Plate

Seawork provided the diving services together with the lifting operations to install a Tideflex Valve plate assembly to ...

Anti-Vortex Plates and Pipework

Following previous works and after the mass concrete plug was cured, Seawork returned to install anti vortex plates and ...