News

New Containerised Chamber/Dive Control

Seawork’s new bespoke fully integrated diving system. Housed in a 20 foot container is a 2 diver panel with ...

Obstruction Marker Pile

Seawork were instructed to undertake a full inspection of a marker pile warning of a large submerged object. The spec ...

Asset Maintenance

Seawork have been busy undertaking asset maintenance on numerous structures at various locations. These are simple to ...

Shuttering and Underpinning

Seawork undertook the design and site work to stabilise a retaining wall that had scoured and was failing. Galvanised ...

Back on the Thames Again

Seawork were back on the Thames removing the other

Thames Fender Work

Seawork were called in by our long established clients to assist with the removal of a fender that had been damaged by ...