New Containerised Chamber/Dive Control
Seawork’s new bespoke fully integrated diving system. Housed in a 20 foot container is a 2 diver panel with ...
Obstruction Marker Pile
Seawork were instructed to undertake a full inspection of a marker pile warning of a large submerged object. The spec ...
Asset Maintenance
Seawork have been busy undertaking asset maintenance on numerous structures at various locations. These are simple to ...
Shuttering and Underpinning
Seawork undertook the design and site work to stabilise a retaining wall that had scoured and was failing. Galvanised ...
Thames Fender Work
Seawork were called in by our long established clients to assist with the removal of a fender that had been damaged by ...